Aug 2
2014
The Cold-rolled Stainless Steel Projects of Fujian Hongwang Started Construction
On Jul 30, 2014, the cold-rolled stainless steel project with the annual capacity of 1 million tons has officially entered into the construction phase.

The project was jointly invested by Hongwang Investment Group and Fujian Tsingtuo Group with the planned capacity of 1 million tons, while BERIS is responsible for the entire designing work of large-scale cold-rolled stainless steel project. It included three-stands tandem mills continuous with the annealing and pickling line, 20 high mills, five-stands 18 high tandem mill, cold continuous annealing and pickling lines. The project integrated the most advanced cold-rolled stainless steel technology, which also included stand-alone reversible rolling mill, endless continuous rolling mill, black coil continuous annealing and pickling lines. The products covered No.1, 2B, 2D, and 2E. 

The general layout of Fujian Hongwang is combined with the advantage of smooth material transformation and advanced technology processing as well as product variety. As the related party of this project, Hongwang group combined with BERIS, Wuhan Qianye, Baosight software, all have a strong technical force along with the rich experiences. The completion of this project will increase Hongwang’s market competitiveness.